The information provided on this website is for the convenience of the viewer and is not to be considered as a substitution for the "Official Records" of the City of Belle Isle. "Official Records" may be obtained through the Office of the City Clerk of the City of Belle Isle, City Hall, 1600 Nela Avenue, Belle Isle, Orange County, Florida. All completed forms must be submitted to City Hall for approval by the Zoning Department. If applicable, your Building Application and Inspection can be issued by the City's Contracted Engineer. As of May 10, 2010, you will not have to return any documentation to Orange County.
Permiting Forms
LANDUSE002 - BUILDING/LAND USE PERMIT (2 Pages submit with Form Bldg003) CHNGE004 - CHANGE O CONTRACTOR DISCT005 - CERTIFICATE OF DISCLAIMER SUBCONT006 - SUB/CONTRACTOR APPLICATION LIST DISC007 - OWNER/BUILDER DISCLOSURE STATEMENT ELEC008 - ELECTRICAL PERMIT GAS009 - GAS PERMIT MECH010 - MECHANICAL PERMIT PLUMB011 - PLUMBING PERMIT PRODAPP012 - PRODUCT APPROVAL
ZONING REVIEW APPLICATION The Zoning Review Application may be used for the following project descriptions: Accessory Building/Shed, Demolition, Fences, Temporary Pods, Dumpsters and Sheds.
DRIVEWAY APPLICATION FORM A permit is required to install a new or replace an existing driveway. The purpose of the permit is to provide the City with an opportunity to determine if the impervious surface (coverage on a lot) exceeds that allowed by our Codes. Exceeding the 35% allowed coverage on a residential lot is allowed if the required on-site retainage of stormwater runoff is addressed. Review of the proposed driveway by the City Engineer will determine if any retention is needed and, if so, how much.
BOAT DOCK ZONING REVIEW APPLICATION All new construction, repair or reconstruction of boat docks requires a Belle Isle Boat Dock Permit Application. If you are making minor repairs, there may be no charge. If you are redecking or rebuilding a fee of $165.00 may apply. Failure to obtain the necessary permit will result in a double fee. If not in compliance, additional fines may be imposed and the work may have to be removed.